After implementation, during this first Measurement and Verification period, Carbon Lighthouse discovered not all of the proposed energy measures had been fully implemented, which would have resulted in reduced savings. As a result, the Carbon Lighthouse team worked closely with the contractor to fully implement the measures and conducted two more data collection periods to verify energy savings. Our team is committed to ensuring that the proposed savings are realized and do not deem projects complete until this is true.