Industrial: Tesla

https://wwww.carbonlighthouse.com/tesla-motors

Our engineers went to work on Tesla’s mixed-use office, industrial and R&D headquarters — home to their core engineering group, the Dyna Lab for powertrain testing and the battery testing lab.

DEFYING EXPECTATIONS, DRIVEN BY DATA

Before working with Carbon Lighthouse, Tesla’s on-site team had brought in utility and engineering consulting firms to reduce energy use, while working regularly with equipment manufacturers and service providers like Trane for ongoing maintenance support.

Given these relationships, the Tesla team expected us to glean few additional savings, but we love a challenge that puts our experience, infrastructure, and processes to the test.

Our first step with any client engagement is to spend time on-site, learning about the facility’s unique operations from the people who know their building best.

The knowledge and observations of our facilities team partners are always a critical complement to the data we gather from building management systems (BMS).

But our engineers have consistently found that even the most sophisticated BMS will miss important measurements that reveal hidden savings opportunities.

In order to capture this hidden data, our engineers deploy hundreds of new sensors to track thermodynamic, electrical, physical and behavioral measurements for up to six weeks.

TECHNICAL DETAILS

Cooling Towers

When our engineers examined the two cooling towers — each with similar variable frequency drive (VFD) capabilities and capacities — the BMS indicated they were nearly identical in operation and following best practices in alternating usage weekly to extend equipment life.

But after reviewing the millions of new data points our engineers collected, we found the cooling towers were not only physically different, but also operating differently:

  • One is a single-cell cooling tower with a 40 HP fan motor
  • The second is a two-cell tower with two 40 HP fan motors
  • Building load did not require these towers to run together

Carbon Lighthouse’s data- driven approach uncovered an unconventional solution.

  • Even with VFDs on all three fans, cooling tower data revealed greater efficiencies in running the single-cell tower at full, rather than running the two-cell tower at half
  • In this case, “best practices” actually created an energy penalty, and BMS data alone was not enough to uncover the problem
  • Only Carbon Lighthouse’s millions of sensor data points and technology could provide the detail necessary for our engineers to find these types of hidden savings

With ongoing mission-critical activities in the Dyna Lab and battery temperature testing lab, there was no room for taking chances with disruptive actions.

  • Carbon Lighthouse created a custom BMS sequence with a runtime counter which significantly reduced energy use at the cooling towers
  • Sequencing involved careful coordination with building schedules and teams so that the equipment swaps would not disrupt plant operations
  • Our standard practice of continuous data monitoring revealed a number of logic errors that were not visible on the BMS
  • We continued to resolve errors until the cooling tower operations were sufficient to preserve equipment life and reliability
  • We also ensured all upgrades were performing as predicted to generate the savings we had calculated in advance

The Chiller System

Working closely with Trane, the original manufacturer of the chillers, our engineers used data including kW/ton curves measured in the eld to troubleshoot the equipment issues — and the data after calibration showed significantly different performance curves than design or factory testing indicated.

A data mismatch between the BMS and the chillers threatened to jeopardize $30,000 per year in energy savings.

  • During implementation, our engineers detected a different amperage displayed in the BMS versus the amperage displayed internally in the chiller’s current transducer (CT)
  • As we dug into the issue, we found the errors were caused by a BMS CT being placed on the wrong side of the VFD as well as improper calibration

By looking at the plant from a holistic point of view and evaluating the operations of the cooling towers and chillers separately, Carbon Lighthouse delivered significant additional energy savings.

  • To resolve these discrepancies, our engineers collected a set of clean and reliable data for an additional six weeks during implementation
  • Our new baseline data enabled our team to take action and resolve issues with high confidence
  • Working closely with Trane, the original manufacturer of the chillers, our engineers used data including kW/ton curves measured in the eld to troubleshoot the equipment issues. The data after calibration showed significantly different performance curves than design or factory testing indicated
  • The Carbon Lighthouse Unified Engineering System (CLUES) gave our engineers deep insights into the complexities of the Tesla building’s energy use
  • In addition to cutting overall energy use, we used our proprietary CLUES data and analysis to inform careful PID loop tuning and optimize interactions between the two chillers
  • Using additional data not available to the BMS, our team optimized the pumping energy use against chiller use and cooling-tower fan use
  • The data encouraged us to accept penalties in cooling tower energy in exchange for efficiencies in the chiller, balancing both against pumping energy

By looking at the plant holistically, in addition to carefully considering the operations of the cooling towers and chillers separately, Carbon Lighthouse delivered significant additional energy savings. Our team achieved this by optimizing the pumping energy use against chiller use and cooling tower fan use, using additional data not available to the BMS to accept penalties in cooling tower energy in exchange for efficiencies in the chiller, and both balanced against pumping energy.

The Lighting System

  • As part of our whole-building approach, we found a great lighting retrofit opportunity, despite the already efficient existing lighting system
  • During the lighting implementation, our engineers discovered the emergency circuit batteries did not support LED fixtures
  • We also found the new system to be highly configurable to ensure occupant happiness
  • Our team made adjustments to the lighting system until everyone was satisfied and comfortable working in the space
  • Carbon Lighthouse replaced the emergency circuit batteries at no charge to the client
  • We engaged lighting contractors to work through the night to minimize disruption to the Tesla team, leaving clean workspaces every morning

As with all of our engagements, our engineers gathered data before, during and after implementation to verify assumptions and to take corrective actions that would ensure savings accrued as expected.

Our work with Tesla also drove us to create new thermodynamic models for chiller and cooling towers, as well as a new statistical model to determine whole-building load.

Results

Our standard practice is to use what we learn from each new implementation to continuously improve our platform. Energy models developed during our Tesla engagement are now integral to our platform, ready to benefit our future clients.

Prior to our Tesla engagement, our engineers already had over 400 buildings under their tool belts, and our energy modeling was well-tuned to actual operations.

Programs like Tesla’s, however, present exciting new challenges to our engineers and prompt us to create even more customized infrastructure in order to look at the data in the most detailed way possible.

Even with Tesla’s building occupancy in flux — 300 new people moved in during implementation — our in-house impact was so minimal that Tesla’s facility team actually reached out to ask how we were doing it.

Today, our ongoing services model continues to deliver optimizations at no cost to Tesla. For example, we discovered that converting 100,000+ sq ft of factory space to offices would guarantee savings that outperformed our original predictions.

SMART Products

Identify NOI with SMARTcapital

The fastest way to find new NOI generating opportunities

Start now

Acquire NOI with SMARTincome

Generate new NOI and get alerted to NOI drift through nuisance-free fault detection.

Start now